Shelf LifeShelf Life is applicable only for materials stored in unopened and undamaged original factory filled containers.
Minimum Storage Temp: 40ºF / 4ºC
Maximum Storage Temp: 100ºF / 37ºC
CM0480930: 2 years
CM0120930: 1 year
Surface Preparation
General: Surface should be free of grease, dirt, fingerprints, rust and other foreign matter to insure optimum adhesion.
Plastic: Clean thoroughly to remove contaminants and mold release agents. Use isopropyl alcohol or other suitable solvent cleaner. Test system integrity before use or consult your Sherwin-Williams aerospace representative for additional information.
Metals: Chemical treatment such as Zinc or iron phosphate is recommended.
Mixing Instructions
Shake primer component for 10-15 minutes before admixing.
Admix by Volume:
7 Parts Polyurethane Primer CM0480930
1 Part Primer Catalyst CM0120930
Add the Catalyst into the Primer Component.
Reduce approximately 50% with CM0110845 JetFlex Reducer if needed.
It is recommended to filter strain admixed and reduced primer before placing material in containers for spraying.
Application
This product can be applied using conventional air spray equipment, HVLP, Graco Pro 4500 air electrostatic, or Graco Pro 4500 air assisted airless electrostatic. Please consult your Sherwin-Williams representative for specific equipment settings.
- Always air-blow and tack-wipe the surfaces to be painted. Assure that the aircraft is properly grounded for potential static buildup.
- Make sure pots, guns, and lines are purged and cleaned.
- Mix thoroughly and filter strain before spray applying.
- Equipment
Pressure Gun: DeVilbiss or equivalent
Tip: E
Air Cap: 704
Pot Pressure: 5-10 psi (0.35 – 0.69 bar)
Atomizing: 45-50 psi (3.10 – 3.45 bar) - Best results are obtained by a double wet cross coat application.
- Recommended dry film thickness is 1.0-1.1 mils (25-28 microns) – Wet 3.8 – 4.2 mils (96 - 106 microns).
NOTE: Application of these product systems requires recommended temperature / humidity conditions and film thickness ranges. The material, hangar, and aircraft skin temperature should be no lower than 55ºF / 13ºC before, during, and after application.
Drying Schedule
Dry times are based on the dry film thickness of 1.0-1.1 mils (25-28 microns).
Air Dry Times (75°F / 25°C and 50% RH)
Dust Free: 15 minutes
Dry Through: 1 Hour
Bake 30 minutes at 140ºF (60ºC) recommended for complete cure.NOTE: Lower temperatures, heavy film thickness, improper activator range selection and poor air movement will extend the dry time.
Equipment Cleanup
Use clean Ketone–type solvents such as CM0110308 MEK. Do not allow material to cure inside equipment.
Use of Systems Statement
Because of the many types and compositions of plastic available, each user should test the coating on each substrate before production use. Customers must verify FAR/JAR 25.853 regulation compliance on their substrate and system.